• Tesoro
  • Tesoro
  • Tesoro
  • Tesoro
  • Tesoro

Tesoro

BCER provided Mechanical and Electrical engineering services for the design and construction of a new control room for the Tesoro Corporation.  The control room is located on the Tesoro Golden Eagle Avon Wharf in the State of California.  The actual control room and the office were constructed in Martinez, California and shipped via barge to be picked and set on the wharf where final construction and connections took place.  The control room is constructed to comply with Class 1, Div 1 Standards. (NFPA 496 & 497)

 

 

 

 

https://www.youtube.com/watch?v=hOGEbGxZhT8

Project Details

Location:
State of California, Avon Warf

Services:

Client: