• CSU -The Foundry
  • CSU -The Foundry
  • CSU -The Foundry
  • CSU -The Foundry
  • CSU -The Foundry

CSU – The Foundry

BCER partnered with CSU to provide MEP/Technology/Life Safety consulting for the renovation of the CSU Corbett/Parmelee Dining Hall (a.k.a The Foundry) on the main campus. This $10,000,000, 36,000-sf, complete gut and renovate was completed on an aggressive ‘summer renovation schedule,’ and opened in time to serve the 2018 Fall Semester students. The newly renovated dining center has eight (8) distinct micro-restaurants to provide students and guests with a large variety of dining options. The project incorporated low flow plumbing fixtures, LED lighting, and variable flow kitchen exhaust hoods to minimize operating costs for CSU. The project also included the renovation of the Corbett lobby/lounge. The new lobby/lounge provides an area for students to utilize and created a distinct main entrance to the facility.

Project Details

Location:
Ft. Collins, Colorado

Square Footage:
36,000

Services:

Client:

More Plumbing Engineering Projects