DPS DCIS at Fairmount Elementary School
BCER Engineering provided Mechanical and Electrical Engineering
services for the mechanical and electrical system upgrades to DCIS at
Fairmont ECE-8. The following outlines BCER Engineering’s scope:
• Replace the HVAC units serving all classrooms in the building
• Provide a cooling unit for the computer classroom located on the 2nd floor
• Provide new hot water heating distribution piping in the 1924 building
• Provide new temperature controls for all new equipment.
• Remodel the restrooms in the 1924 building
• Miscellaneous upgrades to support architectural work in the 1972 addition
• Balance the HVAC system in the 1972 addition
• Recommission the temperature controls in the 1972 addition
• Conversion of the 1924 building to hot water via new heat exchanger