As part of a consolidation of personnel and resources, United Launch Alliance (ULA) relocated all Denver operations into four leased office buildings located along the I-25 corridor in southeast Denver. All four developer-owned buildings were previously occupied and constitute more than 450,000 sf of usable space allocated to the relocation of ULA. Programmed space includes General office space, upgraded executive space, a data center (10,000 sf), labs (15,000 sf)– computer room environments and raised floor offices, SCIF & CMIF (10,000 sf), conference center, cafeteria (existing to be re-commissioned), DOSC (Network Operations Center/Command Control Center- 16,000 sf) and building lobby upgrades.  BCER provided Construction Administration, Electrical Engineering, Life Safety, Mechanical Engineering, and Plumbing Engineering services for the relocation.

Project Details

Location:
Englewood, Colorado

Square Footage:
450,000

Services:

Client:

More Electrical Engineering Projects